5.4 Practice — Work
Problem 1
A variable force \(F(x)=3x^2+4x\text{ N}\) moves a particle along the x-axis from \(x=1\text{ m}\) to \(x=3\text{ m}\). Find the work done.
Show solution
Integrate F(x) from x = 1 to x = 3.
Problem 2
A spring has spring constant \(k=60\text{ N/m}\). How much work is required to stretch it \(0.5\text{ m}\) beyond its natural length?
Show solution
Integrate F(x) = 60x from x = 0 to x = 0.5.
Problem 3
A force of \(24\text{ lb}\) is required to hold a spring stretched \(4\text{ in}\) (\(\frac{1}{3}\text{ ft}\)) beyond its natural length. Find the work in \(\text{ft}\cdot\text{lb}\) required to stretch it from its natural length to \(6\text{ in}\) (\(\frac{1}{2}\text{ ft}\)).
Show solution
Find k in lb/ft: k(1/3) = 24 => k = 72 lb/ft.
Problem 4
If \(6\text{ J}\) of work is needed to stretch a spring from its natural length of \(10\text{ cm}\) to \(12\text{ cm}\), how much work is needed to stretch it from \(12\text{ cm}\) to \(14\text{ cm}\)?
Show solution
Since (1/2)k(0.02)^2 = 6, stretching from 0.02 m to 0.04 m does work (1/2)k[(0.04)^2 - (0.02)^2] = 3 * (1/2)k(0.02)^2.
Problem 5
A \(50\text{-ft}\) cable weighing \(3\text{ lb/ft}\) hangs vertically from the top of a building. How much work is required to pull the entire cable to the roof?
Show solution
A small slice of length dy at depth y ft weighs 3 dy lb and is lifted y ft.
Problem 6
For the same \(50\text{-ft}\) cable weighing \(3\text{ lb/ft}\), how much work is required to pull only the top \(20\text{ ft}\) of cable onto the roof?
Show solution
The top 20 ft requires int_0^20 3y dy, while the remaining 30 ft (weighing 90 lb) is lifted a full 20 ft.
Problem 7
A leaky bucket moves upward \(20\text{ ft}\) at a constant speed. The combined weight of the bucket and water at height \(y\text{ ft}\) is \(F(y)=40-0.5y\text{ lb}\). Find the total work done lifting the bucket.
Show solution
Integrate F(y) from y = 0 to y = 20.
Problem 8
A cylindrical tank of radius \(2\text{ ft}\) and height \(5\text{ ft}\) is full of water (weight density \(\gamma=62.5\text{ lb/ft}^3\)). Find the work required to pump all the water over the top rim.
Show solution
A horizontal disk of thickness dy at depth y has volume 4*pi dy, weight 250*pi dy, and is lifted y ft.
Problem 9
Find the work done by the force \(F(x)=4x+5\text{ N}\) moving an object from \(x=0\text{ m}\) to \(x=4\text{ m}\).
Show solution
Integrate 4x + 5 from 0 to 4.
Problem 10
A spring has spring constant \(k=100\text{ N/m}\). Find the work required to stretch it from \(x=0.1\text{ m}\) to \(x=0.2\text{ m}\) past natural length.
Show solution
Integrate 100x from 0.1 to 0.2.
Problem 11
A force of \(10\text{ lb}\) stretches a spring \(2\text{ ft}\) beyond its natural length. Find the work needed to stretch it \(4\text{ ft}\) beyond natural length.
Show solution
k = 10/2 = 5 lb/ft. Integrate 5x from 0 to 4.
Problem 12
Find the work done by \(F(x)=6x^2\text{ N}\) from \(x=0\text{ m}\) to \(x=2\text{ m}\).
Show solution
Integrate 6x^2 from 0 to 2.
Problem 13
A \(40\text{-ft}\) rope weighing \(0.5\text{ lb/ft}\) hangs over the edge of a cliff. How much work is done pulling the entire rope to the top?
Show solution
Integrate 0.5y from 0 to 40.
Problem 14
A \(100\text{-lb}\) weight is lifted \(15\text{ ft}\) by a cable weighing \(2\text{ lb/ft}\). Find the total work done lifting both the weight and the \(15\text{ ft}\) of cable.
Show solution
Add the work for the weight (1500 ft-lb) and the cable (225 ft-lb).
Problem 15
Find the work done by \(F(x)=\sin x\text{ N}\) from \(x=0\text{ m}\) to \(x=\pi\text{ m}\).
Show solution
Integrate sin(x) from 0 to pi.